Williams Unified School District
Here, we installed Sarnafil G 410 Feltback, varying between tan and white, with added decor and a 20-year no-dollar-limit warranty. We added ⅞ inch corrugated metal siding. All gutter, ANSI-SPI coping, and 24 gauge fascia metal is galvanized. We finished with 50-year Malarkey shingles in Ecoasis. The overall contract was $750,000.
For the Williams Unified School District, we installed Sarnafil G410 flect back, varying between tan and white. With added decor, 20-year no dollar limit warranty and ⅞ corrugated metal siding. All gutter, ansispi coping, and fascia metal 24 gage galvanized. We finished with 50-year Malarkey shingles ecoasis. It was an overall $750,000 contract.