Anderson Middle School Gym

We installed two layers of two inch Polyiso insulation, a Metal Sales peel and stick underlayment, and 24 gauge, 18 inches wide, 1 ¾ inch standing seaming metal roof with panels up to 100 feet long. We also installed a 24 gauge commercial gutter with three inch structural steel downspouts.

At the Anderson Gym, HRI installed two layers of 2" polyiso insulation, a Metal Sales peel and stick underlayment, and 24 gauge, 18" wide, 1 ¾" standing seaming metal roof with panels up to 100' long. HRI also installed a 24 gauge commercial gutter with 3" structural steel downspouts.